Skip to content

Burullus Main Compression, Phase VII — Petrojet

Written by

in

Location: 31.402° N, 30.868° E — Burullus, Kafr El-Sheikh

A field quality-control laboratory was constructed on site for the Burullus main compression plant, Phase VII. Our dewatering design for the pump station lowered the groundwater table by 10 metres.